loaderimg
image

Description

High-strength PVC solvent cement formulated for bonding PVC pipes, fittings, conduits, and irrigation systems. Fast-setting, clear adhesive designed for pressure and non-pressure applications.

Available Pack Sizes
14 g | 50 g | 100 g | 100 g Can | 250 g Can | 500 g Can

STOCK STATUS

In Stock

PRODUCT HIGHLIGHTS

  • Fast-setting PVC adhesive
  • Strong chemical welding bond
  • Ideal for PVC pipes, joints & fittings
  • Suitable for cold water pressure systems
  • Clear finish, easy application
  • Works on rigid PVC pipes & electrical conduits
  • Excellent penetration & bonding strength
  • Durable, leak-proof joints

TECHNICAL SPECIFICATIONS

SpecificationDetails
TypePVC Solvent Cement
BaseTetrahydrofuran (THF) + PVC Resin
AppearanceClear liquid
ViscosityMedium
Density~0.90 g/cm³
Working Time1–2 minutes
Initial Set Time10–15 minutes
Full Cure Time24 hours
Joint StrengthHigh bonding, leak-proof
Temperature Range-5°C to 50°C
Pressure RatingSuitable for cold water pressure systems
Shelf Life12–18 months

Coverage

One 100 ml bottle can bond approx. 8–10 average PVC joints.
(Based on 20–30 mm pipe size)

SUITABLE APPLICATIONS

  • PVC water supply pipes
  • Irrigation systems
  • UPVC drainage & waste pipes
  • Electrical PVC conduit fittings
  • Swimming pool piping
  • Agriculture pipe systems
  • Plumbing repairs

APPLICATION INSTRUCTIONS

  • Surface Preparation
    • Ensure surfaces are clean and dry
    • Remove dirt, grease, oil, moisture
    • Use PVC cleaner if available
  • Application
    • Apply a uniform layer of cement to pipe & fitting.
    • Immediately push pipe into fitting.
    • Hold firmly for 30 seconds.
    • Allow 10–15 minutes before handling.
    • Do not pressurize for 24 hours.
  • Cleaning
    • Clean excess cement before drying.
    • Close cap tightly after use.

COMPATIBILITY & LIMITATIONS

  • Compatible With:
    • PVC pipes
    • UPVC fittings
    • Electrical conduits
    • Cold water piping systems
  • Not Suitable For:
    • CPVC hot water lines
    • ABS pipes
    • Metal pipes
    • HDPE or PPR

SAFETY & HANDLING

  • Highly flammable
  • Avoid inhaling fumes
  • Keep away from heat & sparks
  • Use in well-ventilated area
  • Keep out of reach of children
  • Avoid contact with eyes

Frequently Asked Questions

Yes, for cold water pressure pipes.

No. Use CPVC cement for hot water.

Minimum 24 hours.

Yes, it becomes clear.

Recommended but not compulsory for small sizes.

No, surfaces must be dry.

Yes, once fully cured.

Yes, if tightly sealed.

1–2 minutes.

Yes, low temperature slows drying.

Rate us and Write a Review

Your Rating for this listing

angry
crying
sleeping
smily
cool
Browse

Your review is recommended to be at least 140 characters long

image

Show all timings
  • Monday07:30 AM - 05:00 PM
  • Tuesday07:30 AM - 05:00 PM
  • Wednesday07:30 AM - 05:00 PM
  • Thursday07:30 AM - 05:00 PM
  • Friday07:30 AM - 05:00 PM

imageYour request has been submitted successfully.

building Own or work here? Claim Now! Claim Now!
image